An Assessment of Major Factors Affecting Construction, Project Cost in Nigeria

Authors

  • Oladipo Francis Olukyode
  • Fatuki Adeola Mathew
  • Aluko Adewale Taiwo

Keywords:

Construction project cost, Construction industry, Client, Project contractor.

Abstract

Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the clients and project contractors. Cost deviation from initial cost plan, had been prevalent on construction sites. The factors responsible for this problem can thus not be ruled out. This study therefore assesses the major factors affecting construction project cost with a view to enhancing construction project procurement and delivery. Related literature were reviewed to aids the direction of this study. Data were obtained through the administration of questionnaires to construction professionals. Data obtained from questionnaires were analyzed using percentage distribution table and mean score bar chart.

References

Ibironke, O. T. (2003) Construction Finance. Birnin Kebbi. Timlab Quanticost.

Love, P. E. D; Tse, R. Y. C and Edwards, D. J (2005) Time-cost relationship in Australian Building construction projects. Nigeria journal of construction and management, 2 (1) 81-86

Ogunsemi D.R. and Jagboro G.O. (2006) Time-Cost Model for Building Projects in Nigeria. Journal of Construction Management and Economics. 24, 253-258.

Kerzner, H. C. (2005) Project management. Sixth Edition. John Wiley and Sons. Incorporated Canada. Patrick Achitabwino (2009) Articles on Construction Industry and National Development.

Neil, J. M. [1983] Construction cost estimating for project control. Upper saddle river NJ. Prentice Hall.

Mbachu J. I. C. and R. N. Nkado, (2004) Reducing building construction costs; the views of Consultants and Contractors. COBRA.

Patrick Achitabwino (2009) Articles on Construction Industry and National Development.

Peter F.K. (1997) Construction Management and Economics 15, 83-94. TELL (2002) The Rot that was PTF Tell magazine Number 43, Special Report. TELL communications limited.

Chan, D. and Kumanaswamy, M. (2006) Compressing Construction Duration: Issues Learned from Hong Kong Building Projects. International Journal of Construction Management, 20(1), 23-35

Koushki, P.A. Al-Rashid, K and Karton, N., (2005) Delay and Cost Increases in the Construction of Private Residential Projects in Kuwait, Journal of Construction Management and Economics, 23 ( 3) 285-294

Omoregie, A. and Radford D. (2006) Infrastructure Delay and Cost Escalations; Causes and Effects in Nigeria. School of Architecture. De Montford University England

Elinwa, U. ,and Buba, S., [1993] Construction cost factors in Nigeria. Journal of construction Engineering and Management. 119, [4] 698-714.

Ogunlana, S., Krit, P. and Vithool, J. (1996) Construction Delays in a Fast Growing Economy: Comparing Thailand with other Economies. International Journal of Project Management. 14(1) 37 45.

Frimpong, Y., Oluwole, J. and Crawford, L. (2003) Causes of Delays and Cost Overruns in Construction of Ground Water Projects in Developing Countries; Ghana as a case study.International Journal of Project Management 21, 321-326.

TELL (2002) The Rot that was PTF. Tell magazine Number 43, Special Report. TELL communications limited.

Manfield, N. R., Ugwu, O.O. and Doran, T. (1994) Causes of Delay and Cost Overruns in Nigeria Construction Projects, International Journal of Project Management 12(4) 254

Asamoah, J. (2002) Satisfying the Energy Hunger in West Africa; A Progress on West Africa Gas Pipeline.African Energy.Brooke Patrick Publications. Johannesburg, http//www.africanenergy.co.za

Manavazhi, M. R. and Adhikari D. K. [200] Material and equipment procurement delays in highway project Nepal. International Journal of project management 20, 627-632

Omole A. O. (1986) Causes of the High Cost of Building and Civil Engineering Construction in Nigeria.The Nigerian Quantity Surveyor, (6) 1-2.

Fisk, E. R. (1997) Construction Project Administration, 5th Edition, Prentice Hall: New Jersey.

Williams P. and Cooke, B. [2003] Construction planning, programming and control 2nd edition. Palgrave, New York.

Ashworth, A. and Hogg, K. [2002] Added value in design and construction. Pearson

Abdulaziz, A. and AL-juwairah, A. [2002] Factors contributing to contruction costs in saudia Arabia, Cost Engineering Morgatown; vol. 44,may.

Kangari, K. (1989) Business Failure in Industry. Journal of Construction Engineering and Management, 115(2) 173-187.

Downloads

Published

2015-10-27

How to Cite

Olukyode, O. F., Mathew, F. A., & Taiwo, A. A. (2015). An Assessment of Major Factors Affecting Construction, Project Cost in Nigeria. International Journal of Sciences: Basic and Applied Research (IJSBAR), 24(4), 308–318. Retrieved from https://gssrr.org/index.php/JournalOfBasicAndApplied/article/view/4640

Issue

Section

Articles